$1.8M DLA Environmental Assessment & Remediation Contract – Charleston AFB Pipeline Release Site, South Carolina
CES provides environmental services at the Charleston AFB (CAFB) Pipeline Release Site for JP-8 that is piped to the facilities. CES is conducting comprehensive site/ source investigations, sampling and analysis of soil/ groundwater, soil gas, waste profiling, T&D of containerized waste, data management, fate and transport evaluation, georeferencing, CSM assessment and updates, receptor surveys/site reconnaissance, historical document review, and system repairs, upgrades and improvements associated with pollution prevention work and system optimization initiatives. Task orders completed at DFSP Charleston include the following:
- Optimization and RA-O of dual-phase extraction and groundwater pump and treat remediation systems
- System optimization initiatives
- Implementation of a biologically enhanced, closed-loop groundwater recirculation program utilizing a specialized oxygenation platform (Super-Ox)
- Surface water and sediment sampling
- Short- and long-term groundwater monitoring to evaluate monitored natural attenuation and remedy performance
- Conceptual site model preparation/updates
- NPDES and UIC Permit Compliance